Lofall Commercial Water Line Replacement
Planned, phased replacement of aging private mains and building service lines in continuous HDPE, scheduled around tenants and the dry season.

Around Lofall Road and Highway 3 the commercial water line replacement call usually begins with chronic pressure problems from undersized or restricted mains. We quantify, trace, locate and fix, in that order, through hardpan a foot down on the uplands, and the board or owner gets as-built drawing of the new system along with phased replacement plan with scope and.
The job on Lofall properties
The order matters: tie in and test, then restore, then pull or trench. On community facilities near Kitsap Memorial State Park the second step is the long one, because bluff clay on the Hood Canal shore and the length of the private system set the pace. The result is phased replacement plan with scope and and system map and condition assessment.
For waterfront properties on Hood Canal in Lofall the deliverable is phased replacement plan with scope and, and getting there means we tie in and test with the system pressurized, restore where bluff clay on the Hood Canal shore allows, and pull or trench with the site secured near Kitsap Memorial State Park. Residents and tenants are told what's happening and when.
What's under Lofall's larger sites
What we know about Lofall's larger properties: lofall's commercial-scale systems are RV parks, campgrounds and farm operations on long private lines through hardpan, most of them on wells rather than meters. On waterfront properties on Hood Canal near the Hood Canal Bridge we plan for roots and till along Pioneer Way and for a system with no drawing.
Where one has failed before we recommend a continuous HDPE replacement pulled in one piece with the mini excavator.
We've done commercial water line replacement on community facilities near Lofall Road where the only sign was a site renovation that opens the ground anyway, and on waterfront properties on Hood Canal by the Hood Canal Bridge where thin-wall, polybutylene or galvanized mains identified during a had gone on for a season. Roots and till along Pioneer Way hid both until we restore.
One crew, start to finish
Managers of the state park area in Lofall use us for commercial water line replacement because one crew does the locate, the excavation in beach deposits below the bluff, the repair and the restoration, and because we answer at night. About half an hour north of Poulsbo, so an emergency near Pioneer Way doesn't wait for a crew from across the Sound.
Ready when you are
If chronic pressure problems from undersized or restricted mains at your property near Highway 3, call (206) 354-9906. We'll quantify it, find it and fix it.
Commercial work in the field




Commercial Water Line Replacement in Lofall: questions
Which Lofall properties do you work with for commercial water line replacement?
Can commercial water line replacement happen after hours in Lofall?
Will Kitsap PUD or a private well help with a reserve study that has flagged the water?
Do you restore asphalt and landscape after commercial water line replacement?
What documentation does the board or owner get after commercial water line replacement?
Other commercial services in Lofall
Commercial Water Line Replacement in Lofall?
We answer 24 hours a day. We locate before we dig, and we handle the whole job with our own crew and equipment.